Hong Kong Jobs

CEDD Projects

CEDD Projects
  1. Engineering Feasibility Study for Police Facilities in Kong Nga Po – Feasibility Study
  2. Engineering Feasibility Study for Residential Use in Kong Nga Po – Investigation
  3. Engineering Study Review for Site Formation and Infrastructure Works at Hong Po Road – Feasibility Study &
    Engineering Study Review for Site Formation and Infrastructure Works at San Hing Road, Tuen Mun
  4. Review of Traffic, Environmental, Drainage and Sewerage Impact Assessment in Area 54, Tuen Mun – Phase 1 and 2
  5. Environmental Review for Extension of Operation of Fill Banks at Tuen Mun Area 38 – Investigation – Traffic Impact Assessment Review
  6. Provision of Two Grade-Separeted Pedestrian Linkages to the KTTC Redevelopment – Design and Construction
  7. West Kowloon Reclamation – TIA Review for the West Kowloon Cultural District
  8. Tseung Kwan O – Lam Tin Tunnel – Toll Strategy Review
  9. Study on Partial Development of Fanling Golf Course Site – Feasibility Study
  10. Study on Multi-storey Heavy Goods Vehicle Car Park Cum Modern Logistics Building in Kwai Chung – Feasibility Study
  11. Shatin New Town, Stage II Road T3 and Associated Road Works
  12. North-South Link(s) as Alternative to So Kwun Po (Kai Leng) Roundabout in North District – Feasibility Study
  13. 4 Engineering Feasibility Studies for Site Formation and Infrastructure Works for Housing Developments in North District – Feasibility Study
  14. Study on Concrete Supply in Hong Kong – Feasibility Study (illustrated with CBP option in Tsing Yi)
  15. Study on Proposed Multi-storey Buildings in Yuen Long Area for Brownfield Operations – Feasibility Study
  16. West Kowloon Reclamation Comprehensive Traffic Analysis Review
  17. West Kowloon Reclamation – Traffic Study for Possible Re-schedule provision of Roads D12, D1 and D1A (S)
  18. TIA Study for the Different Land Use of Site A at West Kowloon Reclamation
  19. Harbourfront Signage Scheme – Design and Construction
  20. Central and Wan Chai Reclamation Phase III Review and Design Study
  21. Central Reclamation Phase 3 Study
  22. Wan Chai Development Phase II – Central – Wan Chai Bypass at Wan Chai East
  23. Environmental Review for Extension of Operation of Fill Banks at TKO Area 137 and Tuen Mun Area 38 – Investigation
Other Hong Kong Projects

Tsim Sha Tsui projects

ASD projects

CEDD projects

Government projects

Hospitals & Elderly Home projects

Residential projects

Educational Development Projects

URA projects

Urban Renewal Authority

TTM projects

Temporary Traffic Management