CEDD Projects
CEDD Projects

- Engineering Feasibility Study for Police Facilities in Kong Nga Po – Feasibility Study
- Engineering Feasibility Study for Residential Use in Kong Nga Po – Investigation
- Engineering Study Review for Site Formation and Infrastructure Works at Hong Po Road – Feasibility Study &
Engineering Study Review for Site Formation and Infrastructure Works at San Hing Road, Tuen Mun - Review of Traffic, Environmental, Drainage and Sewerage Impact Assessment in Area 54, Tuen Mun – Phase 1 and 2
- Environmental Review for Extension of Operation of Fill Banks at Tuen Mun Area 38 – Investigation – Traffic Impact Assessment Review
- Provision of Two Grade-Separeted Pedestrian Linkages to the KTTC Redevelopment – Design and Construction
- West Kowloon Reclamation – TIA Review for the West Kowloon Cultural District
- Tseung Kwan O – Lam Tin Tunnel – Toll Strategy Review
- Study on Partial Development of Fanling Golf Course Site – Feasibility Study
- Study on Multi-storey Heavy Goods Vehicle Car Park Cum Modern Logistics Building in Kwai Chung – Feasibility Study
- Shatin New Town, Stage II Road T3 and Associated Road Works
- North-South Link(s) as Alternative to So Kwun Po (Kai Leng) Roundabout in North District – Feasibility Study
- 4 Engineering Feasibility Studies for Site Formation and Infrastructure Works for Housing Developments in North District – Feasibility Study
- Study on Concrete Supply in Hong Kong – Feasibility Study (illustrated with CBP option in Tsing Yi)
- Study on Proposed Multi-storey Buildings in Yuen Long Area for Brownfield Operations – Feasibility Study
- West Kowloon Reclamation Comprehensive Traffic Analysis Review
- West Kowloon Reclamation – Traffic Study for Possible Re-schedule provision of Roads D12, D1 and D1A (S)
- TIA Study for the Different Land Use of Site A at West Kowloon Reclamation
- Harbourfront Signage Scheme – Design and Construction
- Central and Wan Chai Reclamation Phase III Review and Design Study
- Central Reclamation Phase 3 Study
- Wan Chai Development Phase II – Central – Wan Chai Bypass at Wan Chai East
- Environmental Review for Extension of Operation of Fill Banks at TKO Area 137 and Tuen Mun Area 38 – Investigation
Other Hong Kong Projects

Tsim Sha Tsui projects

ASD projects

CEDD projects

Government projects

Hospitals & Elderly Home projects

Residential projects

Educational Development Projects

URA projects
Urban Renewal Authority

TTM projects
Temporary Traffic Management